Thursday, August 20, 2009

Remodel - Day 2

Insulation is partly installed. All the pink stuff is up. Plastic sheeting is partially up as is the brown paper that is the final layer. Contractor's contractor made good progress considering how hot it is in my unit

Once this is all up up, sheetrock will be next.
Electrical and cable wiring is run into space. There are going to be 4 outlets in the room plus cable wiring. Contractor suggested recessed lighting which I wasn't sure about. Seems pretty boring.

Salesman at Yale Electric said the same so that's what we are going with. I though I might do some sconces to give some pizazz to the lighting but since I don't know which side the closet will be on yet, I decided to skip it.





















No comments: